Engine Oil Cooler: Installation
- INSTALL OIL COOLER SPACER
- Apply a light coat of engine oil to a new gasket.
- Install the gasket to the oil cooler spacer.
- Install the oil cooler spacer to the oil filter bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- INSTALL OIL COOLER ASSEMBLY
- Apply a light coat of engine oil to 2 new O-rings.
- Install the 2 O-rings to the oil cooler.
- Install the oil cooler with the 5 nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL OIL FILTER BRACKET
- Apply a light coat of engine oil to 2 new O-rings.
- Install the 2 O-rings to the timing chain cover.
- Install the oil filter bracket with the 2 nuts and 2 bolts.
Torque: 35 N*m (357 kgf*cm, 26 ft.*lbf)
- INSTALL NO. 1 OIL COOLER BRACKET
- Connect the ground wire to the cylinder block.
- Install the oil cooler bracket with the 2 nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
- Connect the 4 hoses.
- Install the water by-pass hose with the 3 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- CONNECT COOLER COMPRESSOR ASSEMBLY (See INSTALLATION )
- INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY (See REMOVAL )
- INSTALL OIL FILTER ELEMENT (See REPLACEMENT )
- INSTALL FAN AND GENERATOR V BELT (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- ADD ENGINE OIL (See REPLACEMENT )
- ADD ENGINE COOLANT (See REPLACEMENT )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSPECT FOR OIL LEAK (See REPLACEMENT )
- INSPECT ENGINE OIL LEVEL (See ON-VEHICLE INSPECTION )
- INSPECT FOR COOLANT LEAK (See ON-VEHICLE INSPECTION )
- INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH (See INSTALLATION )
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH (See INSTALLATION )