Replacing power distribution box (Cooper Convertible)
IMPORTANT:
Read and comply with NOTES
on protection against electrostatic discharge (ESD protection).
Preliminary work needed:
- Remove CONTROL UNIT.
Removal:
Release lock (1).
Detach cable (3) from equipment holder (4).
Carefully pull out power distribution box (2).
Unlock connector (1) and detach.
Remove power distribution box (2).
Installation:
Connect the connector (1) to the power distribution box (2).
Connectors (1) must engage audibly.
Route cable (3) in the equipment holder (1).
Push the power distribution box (2) into the equipment holder (1) and snap into place.
Required follow-up work:
- Install CONTROL UNIT.