LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2018 >> Grand Cherokee Trackhawk >> Repair and Diagnosis (Single Page) >> Body & Frame >> Windows >> Body - Interior/Exterior >> DECKLID/Hatch/Liftgate/Tailgate/Swing Gate >> Latch >> Installation

DECKLID/Hatch/Liftgate/Tailgate/Swing Gate: Latch: Installation

GC0145854Courtesy of CHRYSLER GROUP, LLC
  1. Position the latch (2) onto the inside of the liftgate (1).
  2. Install and tighten the three bolts (3) that secure the latch (2) to the inside of the liftgate.
  3. Tighten the bolts to 12 N.m (9 ft. lbs.).
    GC0145853Courtesy of CHRYSLER GROUP, LLC
  4. Connect the latch release cable (2) to the handle and seat the support clips.
  5. Connect electrical connectors (3, 5) to the latch (4).
    GC0145842Courtesy of CHRYSLER GROUP, LLC
  6. Install the trim panel. Refer to PANEL, TRIM, INSTALLATION .
  7. Connect the battery negative cable.