  1. Position the engine/transmission into the engine compartment and lower the assembly into position. See Fig 37.
  2. Align the engine mount brackets to the front engine mounts and install the engine mount nuts. See Fig 31. Tighten the engine mount nuts to specification. See TORQUE SPECIFICATIONS .
  3. Operate the engine hoist and the vehicle lift simultaneously to raise the vehicle to a convenient working height.
  4. Position a transmission jack and raise the support bed of the jack to take the weight of the transmission. Install and adjust the chains to secure the transmission to the jack. See Fig 35.
  5. Install the crossmember mounting assembly. Install, but do not tighten the 4 crossmember mounting assembly bolts. See Fig 36. Install the transmission mount nut. See Fig 34. Tighten the transmission mount nut and the crossmember bolts to specification. See TORQUE SPECIFICATIONS .
  6. Release transmission jack chains and remove the transmission jack.
  7. Operate the engine hoist and the vehicle lift simultaneously to lower the vehicle to a convenient working height.
  8. Lower the engine hoist and remove the chain assembly and engine lifting brackets. See Fig 30. Move the engine hoist away from the vehicle.
  9. Raise and support the vehicle. Install the selector lever of the transmission selector cable to the transmission cross shaft. Install the transmission cross shaft nut. Install the selector cable bracket to the transmission and install the selector cable bracket bolts. See Fig 33. Tighten cross shaft nut and selector cable bracket bolts to specification. See TORQUE SPECIFICATIONS .
  10. Connect the transmission harness connector and secure the connector lock lever. See Fig 32.
  11. Install and tighten the ground cable to the transmission housing. See Fig 20.
  12. Install the downpipe catalytic converter bracket to the bell housing. See Fig 15. Install the 2 mounting bracket bolts and tighten to specification. See TORQUE SPECIFICATIONS . Repeat for the other catalytic converter.
  13. CAUTION: To preserve drive line integrity, individual parts other than the flange bolts, MUST NOT be renewed. In the event of any balance or drive shaft component related problem, the complete assembly must be replaced. Under no circumstances may the flexible coupling be removed or loosened from the drive shaft. Do not drop or subject the drive shaft to damage.
    NOTE: To tighten the final drive coupling assembly bolts to specification, Torque Adaptor (Snap-on FRDHM13) or equivalent must be used with one of the following methods: Using a torque wrench calibration machine, apply the specified torque at the calibrator (using the torque adaptor) and note the corresponding reading at the torque wrench. Or, using a formula to calculate the effect of the added length. Length RS = (W x T) / (W + L). Where RS = Torque wrench setting; W = Effective length of the torque wrench; T = Torque specification; L = Length of adaptor. Example: Using a torque wrench 13.0 In. (330 mm or 0.33 m) long and an adaptor 2.0 In. (50 mm or 0.05 m) long, calculate as follows for a specified torque of 44 Ft. Lbs. (60 N.m). Standard: RS = (13 x 44) / (13 + 2) or 572 / 15 = 38. Metric: RS = (0.33 x 60) / (0.33 + 0.05) or 19.8 / 0.38 = 52.1 N.m.
  14. Noting the position marked during removal and using NEW bolts, install the drive shaft to the final drive flange. Tighten the 4 coupling assembly bolts to specification. See TORQUE SPECIFICATIONS . See Fig 38.
  15. Noting the position marked during removal and using NEW bolts, move the drive shaft sliding joint from the minimum length position and install the drive shaft to the transmission flange. Tighten the 3 coupling assembly bolts to specification. See TORQUE SPECIFICATIONS . See Fig 17.
  16. Install a NEW gasket to the downpipe catalytic converter flange and install the downpipe catalytic converter to the exhaust manifold. Install the downpipe catalytic converter-to-lower mounting bracket bolts but do not tighten. Repeat for the other downpipe catalytic converter. Lower vehicle.
  17. Install and tighten the downpipe catalytic converter-to-exhaust manifold flange nuts (both "A" bank and "B" banks). See TORQUE SPECIFICATIONS . See Fig 13.
  18. Raise and support the vehicle. Slide front muffler up and connect to the downpipe catalytic converters. Slide muffler back and connect to the intermediate muffler. Align as necessary, reposition all muffler clamps and tighten clamps to specification. Tighten the downpipe catalytic converter-to-lower mounting bracket bolts to specification. See TORQUE SPECIFICATIONS .
  19. If equipped, connect the oil cooler lines to the engine. Remove the plugs from the oil cooler lines and fittings on the engine. Install NEW "O" rings on the oil cooler lines and lubricate with clean engine oil. Install the oil cooler lines to the engine. Install the clamping plate with bolt and tighten to specification. See TORQUE SPECIFICATIONS . See Fig 21.
  20. Install the parking brake relay lever mounting bracket. See Fig 16. Lower the vehicle.
  21. Install the heater return and supply hoses. Tighten heater hose clamps. Install the brake servo hose. See Fig 29.
  22. Install the engine management harness connector to the mounting bracket. Connect the engine management harness connectors and tighten the bolt. See Fig 24.
  23. Noting position marked during removal, connect the transmission rotary switch harness connector and oxygen sensor connectors. Install connector to mounting bracket. See Fig 12.
  24. Install the throttle cable bracket and throttle cable bracket screws. Rotate the throttle actuator cam and connect the throttle cable and position the cable into the cam. Remove any tape or plastic tie strap. Tighten throttle cable bracket screws to specification. See TORQUE SPECIFICATIONS . See Fig 28.
  25. Connect the partial load breather hose and tighten the clamp securing the part load breather hose to the purge valve. Connect the vacuum hose to the purge valve. See Fig 27.
  26. Connect the fuel feed hose to the fuel feed pipe. See Fig 25. Ensure that quick fit connector is fully seated to the fuel feed pipe.
  27. Connect the fuel return hose to the fuel return pipe. See Fig 26. Ensure that the quick fit connector is fully seated to the fuel return pipe.
  28. Route the positive cable through the heatshield and install the cable to the starter motor positive cable stud. Install and tighten the nut to the stud. Reposition the protective boot over the starter cable power stud. Connect the engine management harness-to-starter motor connector. Install the connector to the mounting bracket and secure the cable with a NEW tie strap. See Fig 23.
  29. If equipped, connect the generator suppression module harness connector and reposition the harness under the suppression module. See Fig 22.
  30. Remove the plugs and cap from the power steering lines and fittings. Install a NEW sealing washer to the high pressure hose, install and tighten the high pressure line. Install the supply hose to the pump and position the hose clamp to secure the hose. See Fig 11.
  31. Connect the engine oil pressure sensor connector. See Fig 10.
  32. Install the radiator. See RADIATOR .
  33. Connect the lower expansion tank hose to the expansion tank and install and position the hose clamp to secure the hose. Install the expansion tank to the left side enclosure panel. See Fig 9.
  34. Connect the coolant level sensor connector. Install the tank to the rear mounting grommets and install expansion tank bolt. See Fig 8.
  35. Install the expansion tank-to-thermostat housing hose and the radiator air bleed hose to the expansion tank. Position the hose clamps to secure the hoses. See Fig 7.
  36. Install a NEW air intake tube-to-throttle body seal. Install a NEW "O" ring to the "A" bank breather pipe and install the air intake tube/airflow meter/air cleaner cover assembly. See Fig 6.
  37. Secure the 5 air cleaner cover clips and connect the airflow meter connector. See Fig 5.
  38. Connect the air intake tube to the throttle body and install the 2 bolts which secure the air intake tube to the throttle body. See Fig 4.
  39. Install a NEW strap to secure the vacuum pipe to the intake manifold elbow.
  40. Connect battery. See BATTERY RECONNECT PROCEDURE  under MISCELLANEOUS.
  41. Refill the cooling system. See COOLING SYSTEM .
  42. NOTE: When the engine is started from cold and run for only a short period before being switched off, a quantity of oil will be "hung up" within the engine because it is not up to operating temperature. Should the oil level be topped-up at this time, the level could become too high, causing oil burning. Typically 0.9 Qt. (0.875 L) is "hung up" within the engine.
  43. Refill the engine with engine oil of the correct specification.
  44. Refill the automatic transmission.
  45. Refill and bleed the power steering system.
  46. Using approved A/C equipment, evacuate and recharge A/C system.
  47. Check for leaks and that all lines and hoses are securely connected. Carefully install the engine covers, taking care not to damage the plastic retainers or the rubber inserts.
  48. With assistance, install the engine compartment hood and install the 6 bolts. Install the ground lead to the original location on the left hand hinge. See Fig 2.
  49. Move the engine compartment hood from the service position and connect the gas struts. See Fig 1. Remove the body protection covers and close the engine compartment hood.
Fig 1: Removing & Installing Hood Struts
G00277121Courtesy of JAGUAR CARS, INC.
Fig 2: Removing & Installing Hood
G00277122Courtesy of JAGUAR CARS, INC.
Fig 3: Removing & Installing Engine Cover
G00277123Courtesy of JAGUAR CARS, INC.
Fig 4: Removing & Installing Air Intake Tube Bolts
G00271945Courtesy of JAGUAR CARS, INC.
Fig 5: Removing & Installing Air Cleaner Cover Clips
G00271946Courtesy of JAGUAR CARS, INC.
Fig 6: Removing & Installing Air Intake Tube/Airflow Meter/Air Cleaner Cover Assembly
G00271947Courtesy of JAGUAR CARS, INC.
Fig 7: Removing & Installing Expansion Tank Hoses
G00277124Courtesy of JAGUAR CARS, INC.
Fig 8: Removing & Installing Expansion Tank
G00277125Courtesy of JAGUAR CARS, INC.
Fig 9: Removing & Installing Expansion Tank Lower Hose
G00277126Courtesy of JAGUAR CARS, INC.
Fig 10: Removing & Installing Oil Pressure Sensor Connector
G00277127Courtesy of JAGUAR CARS, INC.
Fig 11: Removing & Installing Power Steering Pump Lines
G00277128Courtesy of JAGUAR CARS, INC.
Fig 12: Removing & Installing Oxygen Sensor & Transmission Rotary Switch Connectors
G00277129Courtesy of JAGUAR CARS, INC.
Fig 13: Removing & Installing Bank Downpipe Catalytic Converter ("B" Bank Shown; "A" Bank Is Similar)
G00271906Courtesy of JAGUAR CARS, INC.
Fig 14: Removing & Installing Muffler Clamps
G00277130Courtesy of JAGUAR CARS, INC.
Fig 15: Removing & Installing Catalytic Converter Mounting Bracket Bolts
G00277041Courtesy of JAGUAR CARS, INC.
Fig 16: Removing & Installing Parking Brake Relay Lever Assembly
G00277131Courtesy of JAGUAR CARS, INC.
Fig 17: Removing & Installing Drive Shaft Assembly At Transmission
G00277132Courtesy of JAGUAR CARS, INC.
Fig 18: Identifying Driveshaft Assembly Sliding Joint
G00277133Courtesy of JAGUAR CARS, INC.
Fig 19: Removing Driveshaft Assembly At Final Drive
G00277134Courtesy of JAGUAR CARS, INC.
Fig 20: Removing & Installing Ground Cable At Transmission Housing
G00277135Courtesy of JAGUAR CARS, INC.
Fig 21: Removing & Installing Oil Cooler Lines At Engine
G00277136Courtesy of JAGUAR CARS, INC.
Fig 22: Identifying Generator Suppression Module Connector
G00277137Courtesy of JAGUAR CARS, INC.
Fig 23: Removing & Installing Starter Cable
G00277138Courtesy of JAGUAR CARS, INC.
Fig 24: Removing & Installing Engine Management Harness
G00277139Courtesy of JAGUAR CARS, INC.
Fig 25: Identifying Fuel Feed Hose Quick Fit Connector
G00277062Courtesy of JAGUAR CARS, INC.
Fig 26: Identifying Fuel Return Hose Quick Fit Connector
G00277063Courtesy of JAGUAR CARS, INC.
Fig 27: Removing & Installing Purge Valve Lines
G00277140Courtesy of JAGUAR CARS, INC.
Fig 28: Removing & Installing Throttle Cable With Bracket
G00277141Courtesy of JAGUAR CARS, INC.
Fig 29: Removing & Installing Brake Servo Hose & Heater Hoses
G00277142Courtesy of JAGUAR CARS, INC.
Fig 30: Installing Engine Lifting Brackets
G00277143Courtesy of JAGUAR CARS, INC.
Fig 31: Removing & Installing Front Engine Mount Nuts
G00277144Courtesy of JAGUAR CARS, INC.
Fig 32: Removing & Installing Transmission Harness Connector
G00277145Courtesy of JAGUAR CARS, INC.
Fig 33: Removing & Installing Transmission Selector Cable
G00277146Courtesy of JAGUAR CARS, INC.
Fig 34: Removing & Installing Transmission Mount
G00277147Courtesy of JAGUAR CARS, INC.
Fig 35: Positioning Transmission Jack
G00277148Courtesy of JAGUAR CARS, INC.
Fig 36: Removing & Installing Crossmember Mounting Assembly
G00277149Courtesy of JAGUAR CARS, INC.
Fig 37: Removing & Installing Engine/Transmission Assembly
G00277150Courtesy of JAGUAR CARS, INC.
Fig 38: Installing Drive Shaft To Final Drive Flange
G00277151Courtesy of JAGUAR CARS, INC.