Over-Run Alternator Decoupler (OAD) Pulley Removal and Installation: Installation
- Loosely tighten the OAD pulley (A), then insert the alternator OAD pulley holder (B) into the OAD pulley.
- Place a 10 mm deep socket wrench (A) through center of the alternator OAD pulley holder (B), onto the hex on the end of the alternator shaft.
- Hold the alternator OAD pulley holder with a 17 mm wrench (C), then tighten the alternator shaft counterclockwise to the specified torque.
Specified Torque:
80 N.m (8.2 kgf.m, 59 lbf.ft)
- Install the new OAD pulley seal cap (A).
- Install the alternator (see INSTALLATION ).