LEMON Manuals: Even more car manuals for everyone
Home >> Honda >> 2007 >> Odyssey EX >> Repair and Diagnosis >> Engine Mechanical >> Lubrication System >> Engine Lubrication System >> Oil Pump Overhaul >> Installation

Oil Pump Overhaul: Installation

  1. Remove the old oil seal from the oil pump.
  2. Apply a light coat of new engine oil around the crankshaft oil seal.
  3. Gently tap in the new oil seal until the oil seal driver bottoms on the pump.
    Fig 1: Identifying Oil Seal
    G05523500Courtesy of AMERICAN HONDA MOTOR CO., INC.
  4. Remove all of the old liquid gasket from the oil pump mating surfaces, the bolts, and the bolt holes.
  5. Clean and dry the oil pump mating surfaces.
  6. Apply liquid gasket, P/N 08717-0004,08718-0001, 08718-0003, or 08718-0009, evenly to the engine block mating surface of the oil pump. Install the component within 5 minutes of applying the liquid gasket.
    NOTE:
    • If you apply liquid gasket P/N 08718-0012, the component must be installed within 4 minutes.
    • If too much time has passed after applying the liquid gasket, remove the old liquid gasket and residue, then reapply the new liquid gasket.
    Fig 2: Identifying Liquid Gasket
    G05523501Courtesy of AMERICAN HONDA MOTOR CO., INC.
  7. Apply a light coat of new engine oil to the lip of the crankshaft oil seal, and apply new engine oil to the new O-ring (A).
    Fig 3: O-Ring, Dowel Pins And Oil Pump With Torque Specifications
    G05523502Courtesy of AMERICAN HONDA MOTOR CO., INC.
  8. Install the dowel pins (B), then align the inner rotor with the crankshaft, and install the oil pump (C).
  9. Clean the excess grease off the crankshaft, and check the seal for distortion.
  10. Install the oil screen (D) with a new O-ring (E).
  11. Install the oil pan (see OIL PAN INSTALLATION ).
  12. Install the rocker arm oil control solenoid/oil filter assembly, with a new rocker arm oil control solenoid filter (J35A6 engine) (see step 39 on CKP PULSE PLATE REPLACEMENT ), or oil filter base/oil filter assembly, with a new O-ring (J35A7 engine) (see step 40 on CKP PULSE PLATE REPLACEMENT ).
  13. Install the timing belt pulley to the crankshaft.
  14. Install the timing belt:
  15. Remove the chain hoist.
  16. After assembly, wait at least 30 minutes before filling the engine with oil.