Selector Lever Cable: Installation
-
- Position the selector lever cable and install the bolt.
Torque: 53 lb.in (6 Nm)
- Connect the selector lever cable.
- Position the selector lever cable and install the bolt.
- Close the grommet box cap and install the bolts.
Torque: 48 lb.in (5.4 Nm)
-
NOTE: Take extra care when handling selector lever cable.
- Connect the selector lever cable to the bracket.
- Connect the selector lever cable retainer.
- Adjust the selector lever cable. Refer to: Selector Lever Cable Adjustment .
- Install the console reinforcement bracket and bolts.
Torque: 22 lb.in (2.5 Nm)
- Connect the floor console upper trim panel electrical connectors.
- Feed the shift boot through the panel opening and install the floor console upper trim panel.
- Attach the selector lever boot retainer tabs to the trim ring.
- Install the handle or trim plate and bolts.
Torque: 48 lb.in (5.4 Nm)
- Install the lower instrument trim panel.