Climate Units: Accumulator: Installation
NOTE:
For tightening torques, see: TIGHTENING TORQUE .
INSTALLING RECEIVER
Fill the recommended volume of compressor oil. See: AC-SYSTEM, OIL, REFILLING .
NOTE:
Install the receiver within 5-10 minutes of the plugs having been removed. This prevents the absorbent material absorbing moisture from the air.
Install:
- the receiver together with 3 M8 screws. Tighten
- the pipe couplings, 2 x M8. Make sure the O-rings are securely located. Tighten the screws
- the M8 nut below the fender liner. Tighten
- the fender liner together with the plastic nut and the retaining clip.