Checking Components And Wiring
Check the signal cable between engine control module (ECM) terminal #B46 (#C46) and leak diagnostic unit terminal #3. Check for a short-circuit to supply voltage.
Remedy as necessary.
Other information:
- see CONNECTING THE BREAKOUT BOX
- see SIGNAL SPECIFICATION (2004, 2005)
- see SIGNAL SPECIFICATION (2006, 2007)
- see COMPONENT SPECIFICATIONS
- see LEAK DIAGNOSTIC PUMP
- see CHECKING WIRING AND TERMINALS
- Continue
Refer to VERIFICATION