Installation [08/2019 - ]: Procedure
- INSTALL POWER SWITCH
- Engage the 2 claws to install the power switch.
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY WITH NAVIGATION RECEIVER ASSEMBLY (w/ Navigation System)
Refer to PROCEDURE - Step 16
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL UPPER (w/ Navigation System)
Refer to PROCEDURE - Step 17
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Navigation System)
Refer to PROCEDURE - Step 15
- INSTALL INSTRUMENT PANEL FINISH PANEL END RH
Refer to PROCEDURE - Step 18