Installation [06/2016 - ]: Procedure
- INSTALL INTAKE MANIFOLD
- Install the 2 new gaskets to the intake manifold.
- Install the intake manifold with the 6 bolts.
Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf)
- Engage the 2 clamps.
- Engage the 4 connectors and connect the wire harness.
- Connect the fuel pump connector.
- Engage the clamp and connect the engine wire harness.
- Engage the 5 clamps and connect the battery cable.
- Connect the purge valve connector.
- Connect the manifold absolute pressure sensor connector.
- CONNECT VENTILATION HOSE
- Connect the ventilation hose.
- INSTALL COMPRESSOR WITH MAGNETIC CLUTCH (for Automatic Transmission)
Refer to PROCEDURE - Step 2
- INSTALL FAN AND GENERATOR V BELT (for Manual Transmission)
Refer to PROCEDURE - Step 1
- CONNECT VACUUM TUBE CONNECTOR HOSE (for Manual Transmission)
Refer to PROCEDURE - Step 5
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (for Automatic Transmission)
- Engage the 3 claws and install the No. 1 engine cover sub-assembly.
- CONNECT FUEL DELIVERY PIPE SUB-ASSEMBLY
- Connect the No. 2 fuel vapor feed hose.
- Install the bolt and connect the fuel delivery pipe sub-assembly.
Torque: 6.4 N*m (65 kgf*cm, 57 in.*lbf)
- CONNECT NO. 1 FUEL HOSE
Refer to PROCEDURE - Step 8
- INSTALL INJECTOR COVER (for Bank 2)
Refer to PROCEDURE - Step 10
- INSTALL INJECTOR COVER (for Bank 1)
Refer to PROCEDURE - Step 10
- INSTALL INJECTOR DRIVER
Refer to PROCEDURE - Step 1
- CONNECT THROTTLE WITH MOTOR BODY ASSEMBLY
- Install a new gasket to the intake manifold.
- Install the 4 bolts and throttle with motor body assembly to intake manifold.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 33 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 34 [03/2017 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- INSPECT FUEL PUMP OPERATION AND INSPECT FOR FUEL LEAK
Refer to PROCEDURE - Step 1
- INSPECT THROTTLE WITH MOTOR BODY ASSEMBLY
Refer to PROCEDURE - Step 1