Main Body Ecu: Installation: Procedure
- INSTALL MULTIPLEX NETWORK BODY ECU
- Connect the connectors.
- Rotate the multiplex network body ECU.
- Attach the hook.
- Attach the tab.
- Connect the connector.
- Install the following parts:
- Driver-side lower panel.
Refer to INSTALLATION
- Front side trim (LH).
Refer to PROCEDURE - Step 1
- Front scuff plate (LH).
Refer to PROCEDURE - Step 1
- Driver-side lower panel.
- Connect the negative battery cable.
Refer to PROCEDURE - Step 1
- If the multiplex network body ECU is replaced and the auto configuration is performed, perform the auto configuration using the following procedure.
- Switch the ignition ON (engine off or on) and wait for 1 min or more.
- Switch the ignition off and wait for 3 s or more.
- Switch the ignition ON (engine off or on) and complete the multiplex network body ECU auto configuration.
- Using the Techstream, verify that DTCs U2300:54, U2300:55, or U2300:56 is not displayed.
- If DTC U2300:54, U2300:55, or U2300:56 is displayed, go to the DTC troubleshooting procedure.
U2300:54
U2300:55
Refer to DTC U230055: Central Configuration not configured
U2300:56
Refer to DTC U230056: Central Configuration invalid / incompatible configuration
- If DTC U2300:54, U2300:55, or U2300:56 is displayed, go to the DTC troubleshooting procedure.