Installation [03/2017 - ]: Procedure
- INSTALL FOG LIGHT ASSEMBLY
- Engage the clip to install the fog light assembly.
- Install the 2 screws.
Torque: 2.0 N*m (20 kgf*cm, 18 in.*lbf)
- Connect the connector.
- INSTALL FRONT FENDER LINER
- Install the fender liner with the 3 clips.
- Install the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- PREPARE VEHICLE FOR FOG LIGHT AIM ADJUSTMENT
See step 1
- PREPARE FOR FOG LIGHT AIMING
See step 2
- INSPECT FOG LIGHT AIMING
See step 3
- ADJUST FOG LIGHT AIMING
See step 4