LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2011 >> FJ Cruiser 4WD, Automatic >> Repair and Diagnosis (Single Page) >> Engine Performance >> Engine Control Systems >> Emission Control System (Service Information) >> Purge Valve >> Installation >> Installation

Purge Valve: Installation: Installation

  1. INSTALL PURGE VSV 
    1. Install the purge VSV with the bolt.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

    2. Connect the No. 1 fuel vapor feed hose and fuel vapor feed hose.
    3. Connect the purge VSV connector.
  2. INSTALL V-BANK COVER  . Refer to INSTALLATION - Step 11