LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2010 >> Camry Hybrid >> Repair and Diagnosis >> External Pages >> Different car >> Section 144 (Engine Control System (Service Information)) >> Engine Coolant Temperature Sensor >> Installation >> Installation

Engine Coolant Temperature Sensor: Installation: Installation

WARNING: This page is about a different car, the 2009 Lexus GS 450h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR 
    1. Install a new gasket to the sensor.
    2. Install the sensor.
      Fig 1: Identifying Engine Coolant Temperature Sensor
      GTY104618Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 20 N*m ( 204 kgf*cm, 15 ft.*lbf) 

    3. Connect the sensor connector.
  2. INSTALL INTAKE MANIFOLD  . Refer to INSTALLATION - Step 12
  3. INSTALL INTAKE AIR SURGE TANK  . Refer to INSTALLATION - Step 3
  4. INSTALL THROTTLE BODY  See step  1
  5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE  See step  2
  6. CONNECT NO. 2 VENTILATION HOSE  See step  3
  7. ADD ENGINE COOLANT  . Refer to REPLACEMENT - Step 6
  8. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 3
  9. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH  . Refer to INSTALLATION - Step 6
  10. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH  . Refer to INSTALLATION - Step 7
  11. INSTALL FRONT FENDER TO COWL SIDE SEAL LH  . Refer to INSTALLATION - Step 4
  12. INSTALL FRONT FENDER TO COWL SIDE SEAL RH  . Refer to INSTALLATION - Step 5
  13. INSTALL FRONT UPPER FENDER PROTECTOR LH  . Refer to INSTALLATION - Step 9
  14. INSTALL FRONT UPPER FENDER PROTECTOR RH  . Refer to INSTALLATION - Step 10
  15. INSTALL SERVICE PLUG GRIP  . Refer to INSTALLATION - Step 33
  16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  17. CHECK FOR ENGINE COOLANT LEAKS  . Refer to ON-VEHICLE INSPECTION - Step 1
  18. CHECK FOR FUEL LEAKS  . Refer to ON-VEHICLE INSPECTION - Step 1
  19. CHECK FUNCTION OF THROTTLE BODY  See step  1
  20. INSTALL V-BANK COVER  See step  31
  21. INSTALL ENGINE ROOM SIDE COVER LH  See step  32
  22. INSTALL ENGINE ROOM SIDE COVER RH  See step  33
  23. INSTALL COOL AIR INTAKE DUCT SEAL  See step  34
  24. PERFORM INITIALIZATION 
    1. Perform initialization. Refer to INITIALIZATION .
      NOTE:

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.