LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Yaris Base, 2D Hatchback, Standard >> Repair and Diagnosis >> Engine Mechanical >> Cooling Fan >> Engine Cooling System >> Integration Relay >> Inspection

Integration Relay: Inspection

  1. INSPECT INTEGRATION RELAY 
    1. Inspect the cooling fan relay.
      1. Using an ohmmeter, measure the resistance between the terminals.

        Standard resistance 

        INTEGRATION RELAY

        Tester connection Specified condition
        B5-B8 10 k ohms or higher
        B5-B8 Below 1 ohm (Battery voltage applied between terminals B6 and B7)
        Fig 1: Measuring Resistance Between Integration Relay Terminals
        G04829215Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        NOTE: While using the battery for the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.