LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Yaris Base, 2D Hatchback, Automatic >> Repair and Diagnosis >> Engine Performance >> Engine Control System (1NZ-FE) >> Camshaft Timing Oil Control Valve Assembly >> Installation

Camshaft Timing Oil Control Valve Assembly: Installation

  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY 
    1. Apply a light coat of engine oil to a new O-ring and install it onto the camshaft timing oil control valve assembly.
      NOTE: Do not twist the O-ring.
      Fig 1: Installing Camshaft Timing Oil Control Valve Assembly
      G04828378Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the camshaft timing oil control valve assembly with the bolt.

      Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf) 

      Fig 2: Installing Camshaft Timing Oil Control Valve Assembly With Bolt
      G04828377Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the camshaft timing oil control valve assembly connector.
      Fig 3: Locating Camshaft Timing Oil Control Valve Assembly Connector
      G04828376Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FAN BELT ADJUSTING BAR 
    1. Provisionally install the fan belt adjusting bar with the bolt and nut.
    2. Tighten the nut to the specified torque.

      Torque: 11 N*m (112 kgf*cm, 8.1 ft.*lbf) 

  3. INSTALL FAN AND GENERATOR V BELT (See  DRIVE BELT  ) 
  4. ADJUST FAN AND GENERATOR V BELT (See  DRIVE BELT  ) 
    Fig 4: Locating Fan Belt Adjusting Bar, Bolt And Nut
    G04828375Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  5. INSPECT FAN AND GENERATOR V BELT (See  DRIVE BELT  ) 
  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

  7. CHECK FOR ENGINE OIL LEAKAGE 
  8. INSTALL CYLINDER HEAD COVER NO. 2  (See REMOVAL )
  9. INSTALL ENGINE UNDER COVER RH