LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Sienna LE, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 53 (Charging System (2ZR-FE)) >> Generator >> Installation

Section 53 (Charging System (2ZR-FE)): Generator: Installation

WARNING: This page is about a different car, the 2009 Toyota Corolla. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the wire harness clamp bracket with the bolt.

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

      Fig 1: Locating Wire Harness Clamp Bracket Bolt
      G06010867Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Temporarily install the generator assembly with the 2 bolts.

      Torque: Bolt A 

      43 N*m (438 kgf*cm, 32 ft.*lbf) 

      Bolt B 

      19 N*m (190 kgf*cm, 14 ft.*lbf) 

      Fig 2: Locating Generator Assembly Bolts
      G06010906Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the connector and wire harness clamp.
    4. Install the wire harness to terminal B with the nut and install the terminal cap.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

      Fig 3: Locating Terminal Cap, Nut And Connector
      G06010865Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL V-RIBBED BELT  (See INSTALLATION )
  3. ADJUST V-RIBBED BELT  (See INSTALLATION )
  4. INSPECT V-RIBBED BELT  (See ON-VEHICLE INSPECTION )
  5. INSTALL ENGINE UNDER COVER RH 

    Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL