Purge Valve: Installation
- INSTALL PURGE VSV
- Install the Purge VSV with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 2 vacuum hoses and No. 1 vacuum switching valve connector.
- Install the Purge VSV with the bolt.
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL