Inspection Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the ignition switch to the ON position.
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Combination Meter / Active Test
- Check the CRUISE main indicator light by performing the Active Test.
METER:
METER ACTIVE TEST LISTTester Display Test Part Control Range Indicat. Lamp Cruise Cruise main indicator light BLINK / OFF OK: The indicator light blinks/goes off.
NG: REPLACE COMBINATION METER ASSEMBLY (See REMOVAL )
OK: Go to Next Step
- READ VALUE OF TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the ignition switch to the ON position.
- Turn the Techstream on.
- Enter the following menus: Powertrain / Cruise Control / Data List.
- Check the Data List for proper functioning of the CRUISE main indicator light.
ECM (Cruise control):
DATA LIST - ECM (CRUISE CONTROL)Tester Display Measurement Item/Range Normal Condition CCS Indicator M-CPU Cruise indicator signal (Main CPU) / ON or OFF ON: "CRUISE" on
OFF: "CRUISE" offOK: When the cruise control main switch is operated, the display changes as shown above.
NG: REPLACE ECM (See REMOVAL )
OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (See PROBLEM SYMPTOMS TABLE )