Intake Manifold: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL INTAKE AIR CONTROL VALVE ACTUATOR (for TCV) (See INSTALLATION )
- INSTALL PURGE LINE HOSE
- Attach the clamp to the intake manifold.
- Install the purge line hose to the intake manifold.
- Connect the purge line hose to the clamp.
- INSTALL WIRING HARNESS CLAMP BRACKET
- Install the bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the bracket with the bolt.
- INSTALL CHECK VALVE
- Install the 2 vacuum hoses to the check valve.
- Connect the 2 vacuum hoses to the intake manifold to install the check valve.
- Check that the check valve is installed as shown in the illustration.
- INSTALL UNION TO CONNECTOR TUBE HOSE
- Install the union to connector tube hose to the intake manifold.
- INSTALL INTAKE MANIFOLD
- Close the tumble control valves.NOTE: The valves may be damaged if they are not closed before installing the intake manifold.
HINT:
Connect the battery to the terminals of the actuator and operate the motor to close the valves (See ON-VEHICLE INSPECTION ).
- Install a new gasket to the intake manifold.
- Install the intake manifold with the 6 bolts in the sequence shown in the illustration.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Close the tumble control valves.
- CONNECT NO. 2 VENTILATION HOSE
- Connect the No. 2 ventilation hose to the intake manifold.
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
- Install the vacuum switching valve with the bolt.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Connect the 2 vacuum hoses and union to connector tube hose.
- Install the vacuum switching valve with the bolt.
- CONNECT WIRE HARNESS
- Attach the clamp and wire harness.
- Install the bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the intake air control actuator connector.
- Attach the 2 clamps to the intake manifold and bracket.
- Install the wire harness with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Attach the 2 clamps.
- Connect the 2 wire harness brackets with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 2 connectors.
- Connect the 4 injector connectors.
- INSTALL FUEL TUBE SUB-ASSEMBLY (See FUEL PRESSURE REGULATOR )
- INSTALL THROTTLE BODY ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- CONNECT HEATER HOSE
- Connect the outlet heater water hose to the water by-pass pipe and heater radiator unit.
- Connect the inlet heater water hose to the cylinder head and heater radiator unit.
- INSTALL HOSE TO HOSE TUBE
- Install the tube with the 2 nuts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Connect the hose.
- Install the tube with the 2 nuts.
- CONNECT UNION TO CONNECTOR TUBE HOSE
- Connect the union to connector tube hose to the tube.
- INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY
- Install the cowl top outer panel with the 14 bolts.
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- Attach the 3 clamps.
- Install the cowl top outer panel with the 14 bolts.
- INSTALL COWL VENTILATOR HOUSING SUB-ASSEMBLY
- Attach the 4 clamps to install the cowl ventilator housing.
- INSTALL FRONT WIPER MOTOR AND LINK
- Install the front wiper motor and link (See INSPECTION ).
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADD ENGINE COOLANT (See COOLANT )
- INSPECT FOR COOLANT LEAK (See COOLING SYSTEM )
- INSPECT FOR FUEL LEAK (See FUEL PRESSURE REGULATOR )
- INSTALL NO. 1 ENGINE UNDER COVER (See ENGINE UNIT )
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (See ECM )