LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Land Cruiser >> Repair and Diagnosis >> Accessories & Equipment >> Communication Devices >> Networking >> Network Gateway Ecu >> Installation

Network Gateway Ecu: Installation

  1. INSTALL NETWORK GATEWAY ECU 
    1. Install the ECU with the nut.
    2. Connect the connector.
  2. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL  (See INSTALLATION )
  3. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH  (See INSTALLATION )
    Fig 1: Identifying ECU With Nut
    G05639637Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY  (See INSTALLATION )
  5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY  (See INSTALLATION )
  6. INSTALL LOWER INSTRUMENT PANEL PAD SUBASSEMBLY RH  (See INSTALLATION )
  7. INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION  (See INSTALLATION )
  8. INSTALL FRONT DOOR SCUFF PLATE RH  (See INSTALLATION )
  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  10. CHECK SRS WARNING LIGHT 
    1. Check the SRS warning light (See DIAGNOSIS SYSTEM ).