Ignition Coil And Spark Plug: Installation
- INSTALL SPARK PLUG
- Install the 6 spark plugs.
Torque: 18 N*m (183 kgf*cm, 13 ft.*lbf)
- Install the 6 spark plugs.
- INSTALL IGNITION COIL ASSEMBLY
- Install the 6 ignition coils with the 6 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 6 ignition coil connectors.
- Install the 4 bolts [A].
Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf)
- Install the nut [B].
Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf)
- Install the 2 clamps [C].
- Install the 6 ignition coils with the 6 bolts.
- INSTALL INTAKE AIR SURGE TANK ASSEMBLY (See INSTALLATION )
- TEMPORARILY INSTALL NO. 1 SURGE TANK STAY (See INSTALLATION )
- TEMPORARILY INSTALL THROTTLE BODY BRACKET (See INSTALLATION )
- FULLY TIGHTEN NO. 1 SURGE TANK STAY (See INSTALLATION )
- FULLY TIGHTEN THROTTLE BODY BRACKET (See INSTALLATION )
- CONNECT ENGINE ROOM MAIN WIRE (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR ENGINE COOLANT LEAK (See COOLING SYSTEM )
- INSTALL NO. 1 ENGINE UNDER COVER (See INSTALLATION )
- INSTALL ENGINE UNDER COVER ASSEMBLY (See INSTALLATION )