Floor Shift Assembly: Installation

  1. INSTALL SHIFT LEVER ASSEMBLY 
    1. Install the shift lever with the 4 bolts.

      Torque: 14 N*m (143 kgf*cm, 10 ft.*lbf) 

      Fig 1: Identifying Shift Lever Assembly Bolts
      G05110115Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the indicator light connector.
    3. Connect the shift lock control computer connector.
  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Connect the control cable with the lock clip.
    Fig 2: Identifying Control Cable Lock Clip
    G05110114Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY  (See INSTALLATION )
  4. INSTALL PARKING BRAKE HOLE COVER SUB-ASSEMBLY  (See INSTALLATION )
  5. INSPECT SHIFT LEVER POSITION  (See ADJUSTMENT  )
  6. ADJUST SHIFT LEVER POSITION  (See ADJUSTMENT  )