Purge Valve: Installation
- INSTALL DUTY VACUUM SWITCHING VALVE
- Connect the hose to the vacuum switching valve.
- Install the vacuum switching valve with the bolt.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Connect the vapor feed hose.
- Connect the connector.
- INSTALL V-BANK COVER (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)