Inspection Procedure
- CHECK HARNESS AND CONNECTOR (IG+ - BODY GROUND)
- Disconnect the connector from heater control panel LH.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
STANDARD VOLTAGE SPECIFICATIONSTester Connection Condition Specified Condition E6-1 (IG+) - Body ground Ignition switch on (IG) 10 to 14 V E6-1 (IG+) - Body ground Ignition switch off Below 1 V Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Result
RESULT REFERENCEResult Proceed to OK A NG (w/o Smart key system) B NG (w/ Smart key system) C
B: Go to STARTING SYSTEM
C: Go to PUSH BUTTON START SYSTEM.
A: Go to Next Step
- CHECK HARNESS AND CONNECTOR (GND - BODY GROUND)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
STANDARD RESISTANCE SPECIFICATIONSTester Connection Condition Specified Condition E6-24 (GND) - Body ground Always Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
- Measure the resistance according to the value(s) in the table below.