Inspection Procedure
- INSPECT MULTIPLEX NETWORK BODY ECU (BATB, BECU - ALTB TERMINALS)
- Disconnect the instrument panel J/B (IA, ID) connectors.
- Measure the voltage according to the value(s) in the table below.
Voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition IA-1 (BATB) - Body ground Always 10 to 14 V ID-10 (BECU) -Body ground Always 10 to 14 V ID-16 (ALTB) - Body ground Always 10 to 14 V
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR (BATB, BECU OR ALTB CIRCUIT)
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to next step
- INSPECT MULTIPLEX NETWORK BODY ECU (GND TERMINAL)
- Disconnect the instrument panel J/B (IF, IM) connectors.
- Measure the resistance according to the value(s) in the table below.
Resistance
RESISTANCE SPECIFICATIONTester Connection Condition Specified Condition IF-10 (GND1) - Body ground Always Below 1 Ω IM-9 (GND2) - Body ground Always Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR (GND CIRCUIT)
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE