Inspection Procedure
- PERFORM ACTIVE TEST BY TECHSTREAM (CERTIFICATION ECU - OUTPUT SIGNAL)
- Connect Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the tester on.
- Enter the following menus: Body Electrical / Smart Key / Active Test.
- Perform the Active Test according to the display on the tester.
Smart Key:
ACTIVE TEST DETAIL - SMART KEYTester Display Test Part Control Range In-Bdr Transmitter Luggage compartment oscillator (Inner) ON / OFF Bdoor Transmitter Luggage compartment oscillator (Outer) ON / OFF - Measure the frequency according to the value(s) in the table below.
OK
TESTER CONNECTION AND SPECIFIED CONDITIONTester Connection Condition Specified Condition CG7B (D39-16) - CLG7 (D39-15) During Active Test Frequency is generated (higher than 0 Hz) CG8B (D39-32) - CLG8 (D39-31) During Active Test Frequency is generated (higher than 0 Hz)
NG: REPLACE CERTIFICATION ECU
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to next step
- CHECK WIRE HARNESS (CERTIFICATION ECU - LUGGAGE COMPARTMENT OSCILLATOR)
- Disconnect the D39 ECU connector.
- Disconnect the oscillator connectors.
- Measure the resistance between the oscillator and the certification ECU to check for an open circuit in the wire harness.
Resistance:
Below 1Ω
- Measure the resistance between the oscillator and the certification ECU to check for an short circuit in the wire harness.
Resistance:
10 kΩ or higher
HINT:
Refer to the WIRING DIAGRAM for connection of each terminal.
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE