Inspection Procedure
- INSPECT DLC3 (BETWEEN TC of DLC3 AND CG of DLC3)
- Turn the ignition switch to the ON position.
- Measure the voltage according to the value(s) in the table below.
Standard voltage
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition D1-13 (TC) - D1-4 (CG) 10 to 14 V
NG: Go to step 3
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (BETWEEN SKID CONTROL ECU AND TC of DLC3)
- Turn the ignition switch off.
- Disconnect the skid control ECU connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition S3-8 (TC) - D1-13 (TC) Below 1 Ω S3-8 (TC) - Body ground 10 kΩ or higher
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE BRAKE ACTUATOR ASSEMBLY
- CHECK HARNESS AND CONNECTOR (BETWEEN CG OF DLC3 AND BODY GROUND)
- Turn the ignition switch off.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition D1-4 (CG) - Body ground Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (BETWEEN SKID CONTROL ECU AND TC of DLC3)
- Disconnect the skid control ECU connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition S3-8 (TC) - D1-13 (TC) Below 1 Ω S3-8 (TC) - Body ground 10 kΩ or higher
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE BRAKE ACTUATOR ASSEMBLY