Vane Pump: Installation
- INSTALL VANE PUMP ASSEMBLY
- Install the vane pump assembly with the 2 bolts and nuts.
Torque: 37 N*m (380 kgf*cm, 27 ft.*lbf)
- Connect the oil pressure switch connector.NOTE: Be careful that the oil does not adhere to the connector.
- Install the vane pump assembly with the 2 bolts and nuts.
- INSTALL PRESSURE FEED TUBE ASSEMBLY
- Using SST, connect the pressure feed tube assembly.
SST 09023-38401
Torque: 41 N*m (420 kgf*cm, 30 ft.*lbf)
HINT:
- Use a torque wrench with a fulcrum length of 345 mm (13.58 in.).
- This torque value is effective when SST is parallel to a torque wrench.
- Connect the pressure feed tube clamp with the bolt.
Torque: 7.8 N*m (80 kgf*cm, 69 ft.*lbf)
- Using SST, connect the pressure feed tube assembly.
- CONNECT OIL RESERVOIR TO PUMP HOSE NO. 1
- Connect the oil reservoir to pump hose No. 1 with the clip.
- INSTALL FAN AND GENERATOR V BELT
- INSTALL FRONT WHEEL RH
Torque: 103 N*m (1,050 kgf*cm, 76 ft.*lbf)
- ADD POWER STEERING FLUID
- BLEED POWER STEERING FLUID PS-2
- INSPECT FOR POWER STEERING FLUID LEAK
- INSTALL ENGINE UNDER COVER RH