Ignition Coil And Spark Plug: Installation
- INSTALL SPARK PLUG
- Install the 6 spark plugs.
Torque: 18 N*m (183 kgf*cm, 13 ft.*lbf)
- Install the 6 spark plugs.
- INSTALL IGNITION COIL ASSEMBLY
- Install the 6 ignition coils with the 6 bolts.
Torque: 8.0 N*m (80 kgf*cm, 71 in.*lbf)
- Connect the 6 ignition coil connectors.
- Install the 6 ignition coils with the 6 bolts.
- INSTALL INTAKE AIR SURGE TANK (See INSTALLATION )
- INSTALL EMISSION CONTROL VALVE SET (See INSTALLATION )
- INSTALL AIR CLEANER BRACKET (See INSTALLATION )
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- ADD ENGINE COOLANT (for Engine) (See REPLACEMENT )
- INSTALL NO. 2 ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL HOOD TO COWL TOP SEAL (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See PRECAUTION ).
- INSPECT FOR COOLANT LEAK (for Engine) (See ON-VEHICLE INSPECTION )