Throttle Body: Installation
- INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
- Install a new gasket and the throttle body with motor with the 4 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
- Connect the throttle position sensor and throttle control motor connector.
- Connect the No. 4 water by-pass hose.
- Connect the No. 5 water by-pass hose.
- Install a new gasket and the throttle body with motor with the 4 bolts.
- INSTALL AIR CLEANER ASSEMBLY WITH ELEMENT (See INSTALLATION )
- INSTALL NO. 2 AIR CLEANER HOSE (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: Some systems need to be initialized after the cable is reconnected (see INITIALIZATION ).
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR ENGINE COOLANT LEAK (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER (See INSTALLATION )
- INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY
- Install the front wiper motor and link assembly (see INSTALLATION ).
- INSTALL NO. 1 ENGINE UNDER COVER (See INSTALLATION )