Camshaft Timing Oil Control Valve Assembly: Installation
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
- Install the 2 camshaft timing oil control valves with the 2 bolts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Connect the 2 connectors.
- Install the 2 camshaft timing oil control valves with the 2 bolts.
- INSTALL INTAKE AIR SURGE TANK (See INSTALLATION )
- INSTALL AIR CLEANER ASSEMBLY (See INSPECTION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
- ADD ENGINE COOLANT (See REPLACEMENT )
- CHECK FOR ENGINE COOLANT LEAKAGE (See REPLACEMENT )
- INSTALL V-BANK COVER (See INSPECTION )