LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2007 >> Sequoia Limited, RWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System >> Generator >> Installation

Charging System: Generator: Installation

  1. INSTALL GENERATOR 
    1. Install the generator with the bolt and the 2 nuts.

      Torque: Bolt 39 N*m (400 kgf*cm, 29 ft.*lbf) 

      Nut 10 mm 39 N*m (400 kgf*cm, 29 ft.*lbf) 

      Nut 8 mm 15.5 N*m (158 kgf*cm, 11 ft.*lbf) 

    2. Connect the generator connector.
    3. Connect the generator wire with the nut.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

    4. Install the terminal cap.
    5. Install the wire clamp to the cord clip on the generator.
  2. INSTALL PS VANE PUMP 

    (See INSTALLATION )

  3. INSTALL DRIVE BELT 
    1. Install the belt by turning the belt tensioner counterclockwise.
      NOTE: The pulley bolt for the belt tensioner has a left - hand thread. 
      Fig 1: Installing Belt By Turning Belt Tensioner Counterclockwise
      G04507767Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. CONNECT INTAKE AIR CONNECTOR TO THROTTLE BODY 
  5. PERFORM ON-VEHICLE INSPECTION 

    (See ON-VEHICLE INSPECTION  )

  6. INSTALL THROTTLE BODY COVER 
  7. INSTALL ENGINE UNDER COVER NO.1 
  8. CONNECT CABLE TO NEGATIVE (-) BATTERY TERMINAL 
  9. PERFORM INITIALIZATION 
    1. Perform initialization. (See INITIALIZATION )

      HINT:

      Some system need initialization when disconnecting the cable from the battery terminal.