Floor Shift Assembly: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL FLOOR SHIFT ASSEMBLY
- Install the floor shift assembly with the 4 nuts
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
HINT:
Tighten them in the order, A, B, C and D.
- Connect the shift lock control ECU connector and indicator light wire connector.
- Connect the wire harness clamp.
- Install the floor shift assembly with the 4 nuts
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
- Install the control cable to the shift lever plate.
- Connect the control cable end to the floor shift assembly.
HINT:
Install it with the uneven surface facing up.
- CONNECT FLOOR SHIFT PARKING LOCK CABLE ASSEMBLY
- Pass the parking lock cable through the hole of shift lever plate.
- Insert the slide cap into the shift lever plate.
- Apply MP grease to the shift lock release link.
- Insert the lever pin into the hole in the cable end.
- CHECK KEY INTERLOCK OPERATION
HINT:
(See ON-VEHICLE INSPECTION )
- CHECK SHIFT LOCK OPERATION
HINT:
(See ON-VEHICLE INSPECTION )
- CHECK SHIFT LOCK RELEASE BUTTON OPERATION
HINT:
(See ON-VEHICLE INSPECTION )