Park/Neutral Position Switch: Inspection
- INSPECT PARK/NEUTRAL POSITION SWITCH
- Measure the resistance of the PNP switch when the shift lever is moved to each position.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION TABLETester Connection Shift Lever Position Specified Condition 4 (B) - 5 (L) P or N Below 1 Ω 4 (B) - 5 (L) Except P and N 10 kΩ or higher 1 (RL) - 2 (RB) R Below 1 Ω 1 (RL) - 2 (RB) Except R 10 kΩ or higher 2 (RB) - 7 (DL) D Below 1 Ω 2 (RB) - 7 (DL) Except D 10 kΩ or higher 2 (RB) - 3 (2L) 2 Below 1 Ω 2 (RB) - 3 (2L) Except 2 10 kΩ or higher 2 (RB) - 8 (LL) L Below 1 Ω 2 (RB) - 8 (LL) Except L 10 kΩ or higher
- Measure the resistance of the PNP switch when the shift lever is moved to each position.