Inspection Procedure
- READ VALUE OF INTELLIGENT TESTER
- Connect the intelligent tester to the DLC3.
- Turn the engine switch on (IG) and press the intelligent tester main switch on.
- Read the DATA LIST according to the displays on the tester.
PWR SOURCE CTRL (Power source control ECU):
DATA LISTItem Measurement Item / Range (Display) Normal Condition Diagnostic Note SHIFT P SIG Shift P Signal / ON or OFF ON: Shift P signal ON (Shift position is P)
OFF: Shift P signal OFF (Shift position is not P)- OK:
"ON" (P signal is ON) appears on the screen.
Result
RESULTCondition Proceed to NG C OK (When troubleshooting according to the PROBLEM SYMPTOM TABLE) B OK (When troubleshooting according to the DTC chart) A B: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
C: Go to step 2 below.
A: REPLACE POWER SOURCE CONTROL ECU
- CHECK WIRE HARNESS (POWER SOURCE CONTROL ECU - SHIFT LOCK CONTROL ECU)
- Disconnect the D44 ECU connector.
- Disconnect the D25 ECU connector.
- Measure the resistance according to the value(s) in the table below.
Resistance
RESISTANCE SPECIFICATIONTerminal No. (Symbol) Specified Condition D44-5 (P) - D25-11 (P2) Below 1 Ω D44-5 (P) - Body ground 10 kΩ or higher
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to Next Step
- CHECK POWER SOURCE CONTROL ECU OPERATION
- After replacing the power source control ECU with a normally functioning ECU, check that the push button start function can start normally.
OK:
Push button start function can start normally.
NG: GO TO SHIFT CONTROL SYSTEM. Refer to SHIFT LOCK SYSTEM
OK: END (POWER SOURCE CONTROL ECU DEFECTIVE)
- After replacing the power source control ECU with a normally functioning ECU, check that the push button start function can start normally.