LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2006 >> Tacoma X-Runner >> Repair and Diagnosis >> Engine Performance >> Engine Control System (1GR-FE) >> Camshaft Timing Oil Control Valve Assembly >> Installation

Camshaft Timing Oil Control Valve Assembly: Installation

  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY 
    1. Install the 2 camshaft timing oil control valves with the 2 bolts.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

    2. Connect the 2 connectors.
  2. INSTALL INTAKE AIR SURGE TANK (See  INSTALLATION  ) 
  3. INSTALL AIR CLEANER ASSEMBLY (See  INSTALLATION   ) 
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 

  5. ADD ENGINE COOLANT (See  COOLANT  ) 
  6. CHECK FOR ENGINE COOLANT LEAKAGE (See  COOLANT  ) 
  7. INSTALL V-BANK COVER (See  INSTALLATION   )