Starting System (1ZZ-FE): Starter: Installation
- INSTALL STARTER ASSEMBLY
- Install the starter assembly with the 2 bolts.
Torque: 37 N*m (378 kgf*cm, 27 ft.*lbf)
- Connect the starter wire with the nut [B].
Torque: 9.8 N*m (100 kgf*cm, 7 ft.*lbf)
- Close the terminal cover.
- Connect the starter connector [D].
- Install the starter assembly with the 2 bolts.
- INSTALL ENGINE UNDER COVER LH
- INSTALL ENGINE UNDER COVER RH
- CONNECT BATTERY NEGATIVE TERMINAL
Torque: 54 N*m (55 kgf*cm, 48 in.*lbf)