Inspection Procedure
- CHECK RELAY (Marking: STARTER CUT)
- Remove the starter cut relay.
- Inspect the starter cut relay continuity, as shown in
Fig 1 and TESTING STARTER CUT RELAY CONTINUITY .
Standard:
TESTING STARTER CUT RELAY CONTINUITYTest Between Terminals No. Condition Specified Condition 1 <=> 2 Constant Continuity 3 <=> 4 Apply B+ Between Terminals 1 & 2 Continuity
- NG: REPLACE RELAY
- OK: Go to next step.
- CHECK WIRE HARNESS (TVIP ECU <=> BODY GROUND)
- Disconnect the TVIP ECU connector.
- Turn the ignition switch position to the START.
- Check the voltage between the terminal of the ECU connector and the body ground, as shown in
Fig 2 and TESTING STARTER CUT RELAY VOLTAGE .
Standard:
TESTING STARTER CUT RELAY VOLTAGETest Between Terminals No. Specified condition SRLY (T3-21) <=> Body ground 10 - 14 V
- NG: REPAIR OR REPLACE WIRE HARNESS AND CONNECTOR
- OK: CHECK AND REPLACE TVIP ECU (Refer to ELECTRONIC CIRCUIT INSPECTION PROCEDURE )