Air Induction System: Turbocharger: Installation

  1. To install turbocharger, reverse removal procedure. Use NEW gaskets and "O" rings. Tighten all bolts and nuts to specification. See TORQUE SPECIFICATIONS TABLE at the end of this article.
  2. Use NEW nut and gaskets when installing turbochargers to turbine outlet elbows and outlet elbows to exhaust manifold. Uniformly tighten nuts in several passes. After installing turbochargers and before installing oil pipe and heat insulators, slowly pour one ounce (30 cc) of clean oil into turbo oil inlet using funnel.
  3. Turn impeller wheel shaft by hand to circulate oil onto bearings. To complete installation, reverse removal procedure. Fill cooling system. Check engine oil level. Start engine and check for leaks. Install engine undercover.