Installation (CAMRY 2VZ-FE)
- Install new grommets and "O" rings on injectors. Install 6 injectors on fuel rails. Install 6 insulators and 4 spacers on intake manifold.
- Install 3 injectors with right fuel rail into intake manifold. Ensure injectors rotate smoothly. If injectors do not rotate smoothly, check "O" rings for proper installation. Position injector connectors upward. Install 5 fuel rail bolts.
- Install No. 2 fuel pipe with 4 new gaskets and union bolts. See Figure. Connect fuel inlet and return hoses. Connect 3 wiring harness clamps to left fuel rail. Connect connectors for 6 injectors, cold start injector and coolant temperature sensor. Install air intake chamber.
- Install EGR pipe. Connect wiring harness with clamp. Install engine removal hook and air intake chamber bracket. Connect hoses and connectors removed in removal step 4).
- Connect cold start injector tube and connector. Install right top engine mount bracket. To complete installation, reverse removal procedure. See TORQUE SPECIFICATIONS TABLE - CAMRY 2VZ-FE .