LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 1983 >> Camry LE, 4D Hatchback >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

WARNING: This page is about the Camry DX, 4D Hatchback, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line4,Gas, Manual Strg9.1A
In-Line4,Gas, Power Strg9.6A
Additional Procedure: VALVE: Grind Complete:
Where Air Cond interferes add0.5A
Combination Procedure: ROCKER ARM BUSHINGS: Remove & Replace:
1.7B
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.1A