Charging System Test
WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
CHARGING SYSTEM TEST TABLE
| Step | Action | Value(s) | Yes | No |
|---|---|---|---|---|
| 1 | Did you perform the DIAGNOSTIC SYSTEM CHECK - VEHICLE ? | - | Go to Step 2 | Go to DIAGNOSTIC SYSTEM CHECK - VEHICLE DIAGNOSTIC INFORMATION |
| 2 |
NOTE:
The battery must be above a 70 percent state of charge. Refer to BATTERY CHARGING . Did you perform the BATTERY INSPECTION / TEST ? |
- | Go to Step 3 | Go to BATTERY INSPECTION / TEST |
| 3 |
Does the voltage change with each command? |
- | Go to Step 4 | Go to Step 8 |
| 4 |
Is the voltage within the specified value? |
12.0-15.5 V | Go to Step 5 | Go to Step 6 |
| 5 |
Is the generator output greater than or equal to the load test value as specified in GENERATOR USAGE ? |
- | Generator OK | Go to Step 7 |
| 6 | Is the voltage measured greater than 15.5 volts? | - | Go to Step 12 | Go to Step 7 |
| 7 |
Is the voltage measured of the generator within 0.2 volts of the battery voltage? |
- | Go to Step 14 | Go to Step 9 |
| 8 |
Does the voltage measure greater than the first value ON and near the second value OFF? |
4.7 V 0 V | Go to Step 14 | Go to Step 11 |
| 9 |
Is the voltage measured less than the specified value? |
0.5 V | Go to Step 10 | Go to Step 15 |
| 10 |
Is the voltage measured less than the specified value? |
0.2 V | Go to Step 14 | Go to Step 16 |
| 11 | Test the generator turn on signal circuit for a short or an open. Refer to CIRCUIT TESTING and WIRING REPAIRS . Did you find and correct the condition? |
- | Go to Step 19 | Go to Step 13 |
| 12 | Test the generator battery voltage sense circuit, if equipped, for an open or high resistance. Refer to CIRCUIT TESTING
and WIRING REPAIRS
. Did you find and correct the condition? |
- | Go to Step 19 | Go to Step 14 |
| 13 | Inspect for poor connections at the harness connector of the engine control module (ECM). Refer to TESTING FOR INTERMITTENT CONDITIONS AND POOR CONNECTIONS
and CONNECTOR REPAIRS
. Did you find and correct the condition? |
- | Go to Step 19 | Go to Step 17 |
| 14 | Inspect for poor connections at the generator. Refer to TESTING FOR INTERMITTENT CONDITIONS AND POOR CONNECTIONS
and CONNECTOR REPAIRS
. Did you find and correct the condition? |
- | Go to Step 19 | Go to Step 18 |
| 15 | Repair the high resistance or open in the ground circuit of the generator. Refer to WIRING REPAIRS
. Did you complete the repair? |
- | Go to Step 19 | - |
| 16 | Repair the high resistance or open in the generator output circuit. Refer to WIRING REPAIRS
. Did you complete the repair? |
- | Go to Step 19 | - |
| 17 | Replace the ECM. Refer to CONTROL MODULE REFERENCES
for replacement, setup, and programming. Did you complete the replacement? |
- | Go to Step 19 | - |
| 18 | Replace the generator. Refer to GENERATOR REPLACEMENT . Did you complete the replacement? |
- | Go to Step 19 | - |
| 19 | Operate the vehicle in order to verify the repair. Did you correct the condition? |
- | Generator OK | Go to Step 2 |