LEMON Manuals: Even more car manuals for everyone
Home >> Suzuki >> 2009 >> Equator RMZ-4 >> Repair and Diagnosis (Single Page) >> Engine Performance >> System >> Engine Control System (VQ40DE) - (3 Of 5) >> DTC P0850: PNP Switch >> Overall Function Check >> With GST

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G06441532Courtesy of SUZUKI OF AMERICA CORP.
    VOLTAGE SPECIFICATION

    Condition (Gear position) Voltage V (Known-good data)
    P or N position (A/T) Neutral position (M/T) Approx. 0
    Except above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to [P0850 PNP SWITCH ].