LEMON Manuals: Even more car manuals for everyone
Home >> Suzuki >> 1994 >> Sidekick JS, 2D Utility, Standard >> Repair and Diagnosis (Single Page) >> Electrical >> Starter >> Bench Testing >> Solenoid >> No-Load Performance Test

No-Load Performance Test

  1. Using a jumper wire, connect battery negative terminal to starter housing. Connect positive battery terminal to ammeter. Connect other side of ammeter to starter "S" and BAT terminals. Ensure starter rotates smoothly.
  2. Starter current draw should be less than 90 amps at 11 volts.