Execution Condition
| Secondary parameters | Execution condition |
|---|---|
| 12 V battery system voltage Transmission range Vehicle speed Target secondary pressure change for 0.1 second Target secondary pressure change for 0.5 second ABS* (Target secondary pressure - Measured secondary pressure) Target pulley ratio change for 0.1 second Target pulley ratio change for 0.5 second ABS* (Target pulley ratio - Measured pulley ratio) Accelerator pedal position change for 0.1 second Accelerator pedal position change for 0.5 second Measured line pressure Actual pulley ratio |
10 V or more Drive 2.2 MPH or more 30 kPa or less 50 kPa or less 100 kPa or less 0.003 or less 0.005 or less 0.1 or less 3.6% or less 6% or less 2500 kPa or less 0.35 or more |
| and 1.5 or less |
|
| Torque converter speed ratio Duty of torque converter clutch pressure control solenoid Duty of shift up pressure control solenoid Duty of shift down pressure control solenoid Primary pulley shaft speed Above condition satisfied for |
0.95 or more 55% or more 50% or less 50% or less 3000 rpm or less 1 sec or more |
| *ABS: Absolute value | |