PCV Connector: Installation
WARNING: This page is about a different variant/trim than selected.
- By using new O-rings, install the PCV connector, and connect the water hose and PCV hose No. 2.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Install the bracket air conditioner. Ref. to AIR CONDITIONER>COMPRESSOR>INSTALLATION .
- Connect the connector and terminal B to the generator.
Tightening torque:
15.5 N.m (1.6 kgf-m, 11.4 ft-lb)
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .
- Fill engine coolant. Ref. to COOLING (H4DO)>ENGINE COOLANT>REPLACEMENT>FILLING OF ENGINE COOLANT .
- Check refrigerant leaks. Ref. to AIR CONDITIONER>REFRIGERANT LEAK CHECK>INSPECTION .