Vacuum Pipe Assembly: Installation
- Install the CPC pressure sensor. Ref. to FUEL INJECTION (FUEL SYSTEMS) (H4DOTC)>CPC Pressure Sensor>INSTALLATION .
- Install the vacuum pipe assembly.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Connect the vacuum hose (C) and purge hose (B), and connect the connector (A).
- Install the intake duct No. 2. Ref. to INTAKE (INDUCTION) (H4DOTC)>Intake Duct>INSTALLATION>INTAKE DUCT NO. 2 .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .