Execution Condition
SECONDARY PARAMETERS AND EXECUTION CONDITION - P04F0
| Secondary parameters | Execution condition |
|---|---|
| <High pressure side pressure system> Battery voltage Barometric pressure Air intake manifold absolute pressure - Atmospheric pressure Ambient air temperature Purge control duty ratio Elapsed time after the switching valve in the leak check valve assembly opened |
10.9 V or more 75.06 kPa (563.1 mmHg, 22.2 inHg) or more 30.05 kPa (225.4 mmHg, 8.9 inHg) or more More than 4.4°C (39.9°F) 40% or more More than 2500 ms |
SECONDARY PARAMETERS AND EXECUTION CONDITION - P04F1
| Secondary parameters | Execution condition |
|---|---|
| <Low pressure side pressure system> Battery voltage Barometric pressure Atmospheric pressure - Intake manifold absolute pressure Estimated ejector generation negative pressure Ambient air temperature Purge control duty ratio |
10.9 V or more 75.06 kPa (563.1 mmHg, 22.2 inHg) or more 25.05 kPa (187.9 mmHg, 7.4 inHg) or more 1.5 kPa (11.3 mmHg, 0.4 inHg) or less More than 4.4°C (39.9°F) 40% or more |
| Elapsed time after the switching valve in the leak check valve assembly opened | More than 2500 ms |